Project

Office refurbishment; Keele

Size:   Time scale: 3 weeks

Designed away from the main office, the Hub offers varied working areas. Although the space is open plan, each of the areas are distinguished by the furniture and colour palette. A large squiggle wall and low tables for large collaboration. Private booths for one on one meetings and a poseur height table for laptop work.

As a whole the colour palette and interior design form branded collaboration spaces, enhancing work productivity.